Skip to content
CivicProof

Project record

MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya

PMGSY-III road upgrade KN03-63, 8.400 km, in its 5-year maintenance stage.

Location
Anekal block, Bengaluru Urban district
Alignment drawn
8.4 km · official GIS
Documents
3
Verified facts
11 of 11
11 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

OMMAS lists PMGSY-III work KN03-63 as “MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya”, an upgrade sanctioned in 2019-2020.

Anekal KN03-63 2019 - 2020 ROAD MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya

[1]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1

VerifiedOfficial record

Project / work ID

KN03-63

OMMAS package number KN03-63.

Anekal KN03-63 2019 - 2020 ROAD MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura,…

[1]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1

VerifiedOfficial record

Responsible agency

DPIU Of Bangalore u

The programme implementation unit is recorded as “DPIU Of Bangalore u” (District Programme Implementation Unit, PMGSY, Bengaluru Urban).

3 Bangalore U DPIU Of Bangalore u Anekal KN03-63

[2]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1

VerifiedOfficial record

Contractor

Prakash Reddy V

OMMAS lists the contractor for this work as “Prakash Reddy V”.

666.60 275.99 8.400 0.000 8.400 619.75 Maintenance Regular PMGSY Prakash Reddy V [08 Jul 2020]

[3]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹666.60 lakh

The sanction cost is recorded as 666.60 (₹ lakh); expenditure to date is 619.75 lakh.

666.60 275.99 8.400 0.000 8.400 619.75

[4]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1

VerifiedOfficial record

Maintenance cost due

₹49.43 lakh

The “5 Years Maintenance Cost Due” column shows 49.43 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

22-04-2022

The completion date column reads “Financial: 10-02-2025 / Physical: 22-04-2022”; the physical completion date is 22-04-2022.

49.43 Financial: 10-02 -2025/ Physical: 22-04-2022

[8]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[9]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

8.400 km

Upgrade of a 8.400 km road; 8.400 km recorded as completed.

666.60 275.99 8.400 0.000 8.400 619.75

[4]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

666.60 275.99 8.400 0.000 8.400 619.75 Maintenance Regular PMGSY

[6]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1

VerifiedOfficial record

Quality inspection

Unsatisfactory

Quality monitoring, Jan 2021 to Sep 2026: 2 National Quality Monitor inspections, last graded “Unsatisfactory”; 5 State Quality Monitor inspections, last graded “Satisfactory”.

…to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya 8.400 2 Unsatisfactory 5 Satisfactory

[10]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore U, Jan 2021 to Sep 2026, p. 1

VerifiedOfficial record