Project record
MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya
PMGSY-III road upgrade KN03-63, 8.400 km, in its 5-year maintenance stage.
- Location
- Anekal block, Bengaluru Urban district
- Alignment drawn
- 8.4 km · official GIS
- Documents
- 3
- Verified facts
- 11 of 11
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN03-63 as “MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya”, an upgrade sanctioned in 2019-2020.
Anekal KN03-63 2019 - 2020 ROAD MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya
[1]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Project / work ID
KN03-63
OMMAS package number KN03-63.
Anekal KN03-63 2019 - 2020 ROAD MRL03-Hebbagodi to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura,…
[1]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Responsible agency
DPIU Of Bangalore u
The programme implementation unit is recorded as “DPIU Of Bangalore u” (District Programme Implementation Unit, PMGSY, Bengaluru Urban).
3 Bangalore U DPIU Of Bangalore u Anekal KN03-63
[2]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Contractor
Prakash Reddy V
OMMAS lists the contractor for this work as “Prakash Reddy V”.
666.60 275.99 8.400 0.000 8.400 619.75 Maintenance Regular PMGSY Prakash Reddy V [08 Jul 2020]
[3]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹666.60 lakh
The sanction cost is recorded as 666.60 (₹ lakh); expenditure to date is 619.75 lakh.
666.60 275.99 8.400 0.000 8.400 619.75
[4]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Maintenance cost due
₹49.43 lakh
The “5 Years Maintenance Cost Due” column shows 49.43 (₹ lakh).
49.43 Financial: 10-02 -2025
[7]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
22-04-2022
The completion date column reads “Financial: 10-02-2025 / Physical: 22-04-2022”; the physical completion date is 22-04-2022.
49.43 Financial: 10-02 -2025/ Physical: 22-04-2022
[8]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[9]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.400 km
Upgrade of a 8.400 km road; 8.400 km recorded as completed.
666.60 275.99 8.400 0.000 8.400 619.75
[4]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
666.60 275.99 8.400 0.000 8.400 619.75 Maintenance Regular PMGSY
[6]SLR: Statewise List of Works — Karnataka, Bangalore U, PMGSY-III, p. 1
Quality inspection
Unsatisfactory
Quality monitoring, Jan 2021 to Sep 2026: 2 National Quality Monitor inspections, last graded “Unsatisfactory”; 5 State Quality Monitor inspections, last graded “Satisfactory”.
…to Bangalore South Tq Border via Thirupalya, Hulimangala, S Bingipura, Hullahalli and C K Palya 8.400 2 Unsatisfactory 5 Satisfactory
[10]Works Wise Grading Abstract — NQM/SQM inspections, Bangalore U, Jan 2021 to Sep 2026, p. 1