Project record
Thayalur to Andhra Border via Doolapalli, Yelachepalli, Byrasandra and B.Hosahalli
PMGSY-I · package KN1903 · Mulbagal block · Completed
- Location
- Mulbagal block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Thayalur to Andhra Border via Doolapalli, Yelachepalli, Byrasandra and B.Hosahalli
OMMAS lists PMGSY-I work KN1903 as “Thayalur to Andhra Border via Doolapalli, Yelachepalli, Byrasandra and B.Hosahalli”.
Road Name / Bridge Name: Thayalur to Andhra Border via Doolapalli, Yelachepalli, Byrasandra and B.Hosahalli
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Project / work ID
KN1903
OMMAS package number KN1903.
Package No.: KN1903
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Contractor
Ramky Engineers Pvt Ltd
OMMAS lists the contractor for this work as “Ramky Engineers Pvt Ltd”.
Contractor Name: Ramky Engineers Pvt Ltd [31 Aug 2001]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹22.99 lakh
The sanction cost is recorded as 22.99 (₹ lakh).
Sanction Cost: 22.99
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2003
The completion date column reads “Financial: 15-07-2007/ Physical: 31-12-2003”; the physical completion date is 31-12-2003.
Completion Date: Financial: 15-07-2007/ Physical: 31-12-2003
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.700 km
Road length 3.700 km; 3.700 km recorded as completed.
Road Length (Kms): 3.700
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12