Project record
K.S. Road to B.B. Road
PMGSY-I · package KN1905 · Kolar block · Completed
- Location
- Kolar block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
K.S. Road to B.B. Road
OMMAS lists PMGSY-I work KN1905 as “K.S. Road to B.B. Road”.
Road Name / Bridge Name: K.S. Road to B.B. Road
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 7
Project / work ID
KN1905
OMMAS package number KN1905.
Package No.: KN1905
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 7
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 7
Contractor
V NARAYANASWAMY
OMMAS lists the contractor for this work as “V NARAYANASWAMY”.
Contractor Name: V NARAYANASWAMY [23 Oct 2002]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 7
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹20.55 lakh
The sanction cost is recorded as 20.55 (₹ lakh).
Sanction Cost: 20.55
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 7
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-01-2007
The completion date column reads “Financial: 30-03-2006/ Physical: 31-01-2007”; the physical completion date is 31-01-2007.
Completion Date: Financial: 30-03-2006/ Physical: 31-01-2007
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 7
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.920 km
Road length 2.920 km; 2.920 km recorded as completed.
Road Length (Kms): 2.920
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 7
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 7