Project record
S.P. Road to Gundlapalli
PMGSY-I · package KN1908 · Srinivasapura block · Completed
- Location
- Srinivasapura block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
S.P. Road to Gundlapalli
OMMAS lists PMGSY-I work KN1908 as “S.P. Road to Gundlapalli”.
Road Name / Bridge Name: S.P. Road to Gundlapalli
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 15
Project / work ID
KN1908
OMMAS package number KN1908.
Package No.: KN1908
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 15
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 15
Contractor
Karnataka Land Army Corporation
OMMAS lists the contractor for this work as “Karnataka Land Army Corporation”.
Contractor Name: Karnataka Land Army Corporation [07 Jul 2002]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 15
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹41.73 lakh
The sanction cost is recorded as 41.73 (₹ lakh).
Sanction Cost: 41.73
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 15
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-08-2004
The completion date column reads “Financial: 01-04-2005/ Physical: 31-08-2004”; the physical completion date is 31-08-2004.
Completion Date: Financial: 01-04-2005/ Physical: 31-08-2004
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 15
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.000 km
Road length 6.000 km; 6.000 km recorded as completed.
Road Length (Kms): 6.000
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 15
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 15