Project record
Kuntanahalli - T-02
PMGSY-I · package KN19101 · Malur block · Completed
- Location
- Malur block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kuntanahalli - T-02
OMMAS lists PMGSY-I work KN19101 as “Kuntanahalli - T-02”.
Road Name / Bridge Name: Kuntanahalli - T-02
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Project / work ID
KN19101
OMMAS package number KN19101.
Package No.: KN19101
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Contractor
V NARAYANASWAMY
OMMAS lists the contractor for this work as “V NARAYANASWAMY”.
Contractor Name: V NARAYANASWAMY [11 Sep 2009]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹120.56 lakh
The sanction cost is recorded as 120.56 (₹ lakh).
Sanction Cost: 120.56
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Maintenance cost due
₹8.24 lakh
The “5 Years Maintenance Cost Due” column shows 8.24 (₹ lakh).
5 Years Maintenance Cost Due: 8.24
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2011
The completion date column reads “Financial: 16-01-2012/ Physical: 31-05-2011”; the physical completion date is 31-05-2011.
Completion Date: Financial: 16-01-2012/ Physical: 31-05-2011
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.040 km
Road length 4.040 km; 4.040 km recorded as completed.
Road Length (Kms): 4.040
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12