Project record
T-05 - Chotindlu
PMGSY-I · package KN19102 · Mulbagal block · Completed
- Location
- Mulbagal block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
T-05 - Chotindlu
OMMAS lists PMGSY-I work KN19102 as “T-05 - Chotindlu”.
Road Name / Bridge Name: T-05 - Chotindlu
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Project / work ID
KN19102
OMMAS package number KN19102.
Package No.: KN19102
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Contractor
B M Chandre Gowda
OMMAS lists the contractor for this work as “B M Chandre Gowda”.
Contractor Name: B M Chandre Gowda [23 Oct 2009]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹268.01 lakh
The sanction cost is recorded as 268.01 (₹ lakh).
Sanction Cost: 268.01
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Maintenance cost due
₹19.67 lakh
The “5 Years Maintenance Cost Due” column shows 19.67 (₹ lakh).
5 Years Maintenance Cost Due: 19.67
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2011
The completion date column reads “Financial: 21-03-2012/ Physical: 31-03-2011”; the physical completion date is 31-03-2011.
Completion Date: Financial: 21-03-2012/ Physical: 31-03-2011
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.640 km
Road length 9.640 km; 9.640 km recorded as completed.
Road Length (Kms): 9.640
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14