Project record
Digavapalli - T03
PMGSY-I · package KN19106 · Srinivasapura block · Completed
- Location
- Srinivasapura block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Digavapalli - T03
OMMAS lists PMGSY-I work KN19106 as “Digavapalli - T03”.
Road Name / Bridge Name: Digavapalli - T03
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17
Project / work ID
KN19106
OMMAS package number KN19106.
Package No.: KN19106
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17
Contractor
H.S.Puttaswamy
OMMAS lists the contractor for this work as “H.S.Puttaswamy”.
Contractor Name: H.S.Puttaswamy [19 Aug 2009]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹396.85 lakh
The sanction cost is recorded as 396.85 (₹ lakh).
Sanction Cost: 396.85
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17
Maintenance cost due
₹30.58 lakh
The “5 Years Maintenance Cost Due” column shows 30.58 (₹ lakh).
5 Years Maintenance Cost Due: 30.58
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2011
The completion date column reads “Financial: 26-11-2011/ Physical: 30-06-2011”; the physical completion date is 30-06-2011.
Completion Date: Financial: 26-11-2011/ Physical: 30-06-2011
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
14.990 km
Road length 14.990 km; 14.990 km recorded as completed.
Road Length (Kms): 14.990
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 17