Project record
NH 4 -Bangarpet
PMGSY-I · package KN1912 · Mulbagal block · Completed
- Location
- Mulbagal block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
NH 4 -Bangarpet
OMMAS lists PMGSY-I work KN1912 as “NH 4 -Bangarpet”.
Road Name / Bridge Name: NH 4 -Bangarpet
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Project / work ID
KN1912
OMMAS package number KN1912.
Package No.: KN1912
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Contractor
V NARAYANASWAMY
OMMAS lists the contractor for this work as “V NARAYANASWAMY”.
Contractor Name: V NARAYANASWAMY [11 Mar 2004]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹23.75 lakh
The sanction cost is recorded as 23.75 (₹ lakh).
Sanction Cost: 23.75
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Maintenance cost due
₹1.71 lakh
The “5 Years Maintenance Cost Due” column shows 1.71 (₹ lakh).
5 Years Maintenance Cost Due: 1.71
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2008
The completion date column reads “Financial: 27-10-2010/ Physical: 31-07-2008”; the physical completion date is 31-07-2008.
Completion Date: Financial: 27-10-2010/ Physical: 31-07-2008
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.210 km
Road length 2.210 km; 2.210 km recorded as completed.
Road Length (Kms): 2.210
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 12