Project record

MRL1-Koragandahalli to Vakkaleri

PMGSY-II · package KN19125 · Kolar block · Maintenance

Location
Kolar block, Kolar district
Alignment drawn
none published: found by name
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

MRL1-Koragandahalli to Vakkaleri

OMMAS lists PMGSY-II work KN19125 as “MRL1-Koragandahalli to Vakkaleri”.

Road Name / Bridge Name: MRL1-Koragandahalli to Vakkaleri

[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Project / work ID

KN19125

OMMAS package number KN19125.

VerifiedOfficial record

Responsible agency

DPIU Of Kolar

The programme implementation unit is recorded as “DPIU Of Kolar”.

Programme Implementation Unit: DPIU Of Kolar

[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Contractor

ACR Projects

OMMAS lists the contractor for this work as “ACR Projects”.

Contractor Name: ACR Projects [26 Aug 2014]

[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹204.02 lakh

The sanction cost is recorded as 204.02 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹16.32 lakh

The “5 Years Maintenance Cost Due” column shows 16.32 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

15-06-2017

The completion date column reads “Financial: 31-03-2018/ Physical: 15-06-2017”; the physical completion date is 15-06-2017.

Completion Date: Financial: 31-03-2018/ Physical: 15-06-2017

[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

5.580 km

Road length 5.580 km; 5.580 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record