Project record
T10-KGF-Kuppam SH To Kyasamballi Via Parandahalli,Puttepalli,Kambampalli,Chaldiganahalli,Beeranakuppa,Nachandlahalli,Buchepalli,Madivala
PMGSY-III · package KN19148 · Bangarpet block · Maintenance
- Location
- Bangarpet block, Kolar district
- Alignment drawn
- 860 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN19148 as “T10-KGF-Kuppam SH To Kyasamballi Via Parandahalli,Puttepalli,Kambampalli,Chaldiganahalli,Beeranakuppa,Nachandlahalli,Buchepalli,Madivala”.
Road Name / Bridge Name: T10-KGF-Kuppam SH To Kyasamballi Via Parandahalli,Puttepalli,Kambampalli,Chaldiganahalli,Beeranakuppa,Nachandlahalli,Buchepalli,Madivala
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Project / work ID
KN19148
OMMAS package number KN19148.
Package No.: KN19148
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Contractor
G Chandre Gowda
OMMAS lists the contractor for this work as “G Chandre Gowda”.
Contractor Name: G Chandre Gowda [13 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹376.21 lakh
The sanction cost is recorded as 376.21 (₹ lakh).
Sanction Cost: 376.21
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹30.20 lakh
The “5 Years Maintenance Cost Due” column shows 30.20 (₹ lakh).
5 Years Maintenance Cost Due: 30.20
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2021
The completion date column reads “Financial: 20-12-2021/ Physical: 30-06-2021”; the physical completion date is 30-06-2021.
Completion Date: Financial: 20-12-2021/ Physical: 30-06-2021
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.060 km
Road length 7.060 km; 7.060 km recorded as completed.
Road Length (Kms): 7.060
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1