Project record
T14-Parandahalli MDR to baluvanahalli Via Anatharamapura,Muddegowdanahalli,Jangamanahalli,Madivala majara kottur
PMGSY-III · package KN19149 · Bangarpet block · Maintenance
- Location
- Bangarpet block, Kolar district
- Alignment drawn
- 3.2 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN19149 as “T14-Parandahalli MDR to baluvanahalli Via Anatharamapura,Muddegowdanahalli,Jangamanahalli,Madivala majara kottur”.
Road Name / Bridge Name: T14-Parandahalli MDR to baluvanahalli Via Anatharamapura,Muddegowdanahalli,Jangamanahalli,Madivala majara kottur
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Project / work ID
KN19149
OMMAS package number KN19149.
Package No.: KN19149
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Contractor
ACR Projects
OMMAS lists the contractor for this work as “ACR Projects”.
Contractor Name: ACR Projects [13 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹367.38 lakh
The sanction cost is recorded as 367.38 (₹ lakh).
Sanction Cost: 367.38
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹20.34 lakh
The “5 Years Maintenance Cost Due” column shows 20.34 (₹ lakh).
5 Years Maintenance Cost Due: 20.34
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
29-03-2022
The completion date column reads “Financial: 25-10-2022/ Physical: 29-03-2022”; the physical completion date is 29-03-2022.
Completion Date: Financial: 25-10-2022/ Physical: 29-03-2022
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.430 km
Road length 6.430 km; 6.430 km recorded as completed.
Road Length (Kms): 6.430
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1