Project record
M.G. road - Manjilnagara via Yadarur
PMGSY-I · package KN1915 · Srinivasapura block · Completed
- Location
- Srinivasapura block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
M.G. road - Manjilnagara via Yadarur
OMMAS lists PMGSY-I work KN1915 as “M.G. road - Manjilnagara via Yadarur”.
Road Name / Bridge Name: M.G. road - Manjilnagara via Yadarur
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16
Project / work ID
KN1915
OMMAS package number KN1915.
Package No.: KN1915
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16
Contractor
V Krishna Reddy
OMMAS lists the contractor for this work as “V Krishna Reddy”.
Contractor Name: V Krishna Reddy [10 Apr 2006]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹183.35 lakh
The sanction cost is recorded as 183.35 (₹ lakh).
Sanction Cost: 183.35
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16
Maintenance cost due
₹11.21 lakh
The “5 Years Maintenance Cost Due” column shows 11.21 (₹ lakh).
5 Years Maintenance Cost Due: 11.21
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2007
The completion date column reads “Financial: 23-06-2008/ Physical: 31-03-2007”; the physical completion date is 31-03-2007.
Completion Date: Financial: 23-06-2008/ Physical: 31-03-2007
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.020 km
Road length 9.020 km; 9.020 km recorded as completed.
Road Length (Kms): 9.020
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16