Project record
T09-Vemagal to Bommasandra(MDR)
PMGSY-III · package KN19150 · Kolar block · Maintenance
- Location
- Kolar block, Kolar district
- Alignment drawn
- 2.3 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
T09-Vemagal to Bommasandra(MDR)
OMMAS lists PMGSY-III work KN19150 as “T09-Vemagal to Bommasandra(MDR)”.
Road Name / Bridge Name: T09-Vemagal to Bommasandra(MDR)
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Project / work ID
KN19150
OMMAS package number KN19150.
Package No.: KN19150
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Contractor
C Narayanaswamy
OMMAS lists the contractor for this work as “C Narayanaswamy”.
Contractor Name: C Narayanaswamy [28 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹545.91 lakh
The sanction cost is recorded as 545.91 (₹ lakh).
Sanction Cost: 545.91
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹43.59 lakh
The “5 Years Maintenance Cost Due” column shows 43.59 (₹ lakh).
5 Years Maintenance Cost Due: 43.59
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
17-11-2021
The completion date column reads “Financial: 14-03-2022/ Physical: 17-11-2021”; the physical completion date is 17-11-2021.
Completion Date: Financial: 14-03-2022/ Physical: 17-11-2021
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.325 km
Road length 8.325 km; 8.325 km recorded as completed.
Road Length (Kms): 8.325
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 1