Project record
MRL11-Masthi to Anikarahalli Road
PMGSY-III · package KN19154 · Malur block · Maintenance
- Location
- Malur block, Kolar district
- Alignment drawn
- 7.0 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL11-Masthi to Anikarahalli Road
OMMAS lists PMGSY-III work KN19154 as “MRL11-Masthi to Anikarahalli Road”.
Road Name / Bridge Name: MRL11-Masthi to Anikarahalli Road
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Project / work ID
KN19154
OMMAS package number KN19154.
Package No.: KN19154
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Contractor
Krishna Reddy V
OMMAS lists the contractor for this work as “Krishna Reddy V”.
Contractor Name: Krishna Reddy V [24 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹336.14 lakh
The sanction cost is recorded as 336.14 (₹ lakh).
Sanction Cost: 336.14
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹34.80 lakh
The “5 Years Maintenance Cost Due” column shows 34.80 (₹ lakh).
5 Years Maintenance Cost Due: 34.80
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
28-02-2022
The completion date column reads “Financial: 26-03-2022/ Physical: 28-02-2022”; the physical completion date is 28-02-2022.
Completion Date: Financial: 26-03-2022/ Physical: 28-02-2022
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.941 km
Road length 6.941 km; 6.941 km recorded as completed.
Road Length (Kms): 6.941
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2