Project record
MRL16-Hunisikote to Taluk Border via Ullerahalli,Veerakatpura
PMGSY-III · package KN19155 · Malur block · Maintenance
- Location
- Malur block, Kolar district
- Alignment drawn
- 123 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL16-Hunisikote to Taluk Border via Ullerahalli,Veerakatpura
OMMAS lists PMGSY-III work KN19155 as “MRL16-Hunisikote to Taluk Border via Ullerahalli,Veerakatpura”.
Road Name / Bridge Name: MRL16-Hunisikote to Taluk Border via Ullerahalli,Veerakatpura
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Project / work ID
KN19155
OMMAS package number KN19155.
Package No.: KN19155
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Contractor
A.G Narayanaswamy & Co
OMMAS lists the contractor for this work as “A.G Narayanaswamy & Co”.
Contractor Name: A.G Narayanaswamy & Co [03 Sep 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹265.34 lakh
The sanction cost is recorded as 265.34 (₹ lakh).
Sanction Cost: 265.34
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹24.31 lakh
The “5 Years Maintenance Cost Due” column shows 24.31 (₹ lakh).
5 Years Maintenance Cost Due: 24.31
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2021
The completion date column reads “Financial: 25-10-2022/ Physical: 31-12-2021”; the physical completion date is 31-12-2021.
Completion Date: Financial: 25-10-2022/ Physical: 31-12-2021
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.205 km
Road length 5.205 km; 5.200 km recorded as completed.
Road Length (Kms): 5.205
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 2