Project record
Baljepalli Cross - Bangarpet (T01) Thathireddyhalli (L29, L30)
PMGSY-I · package KN1916 · Bangarpet block · Maintenance
- Location
- Bangarpet block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Baljepalli Cross - Bangarpet (T01) Thathireddyhalli (L29, L30)
OMMAS lists PMGSY-I work KN1916 as “Baljepalli Cross - Bangarpet (T01) Thathireddyhalli (L29, L30)”.
Road Name / Bridge Name: Baljepalli Cross - Bangarpet (T01) Thathireddyhalli (L29, L30)
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2
Project / work ID
KN1916
OMMAS package number KN1916.
Package No.: KN1916
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2
Contractor
V Krishna Reddy
OMMAS lists the contractor for this work as “V Krishna Reddy”.
Contractor Name: V Krishna Reddy [10 Apr 2006]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹111.80 lakh
The sanction cost is recorded as 111.80 (₹ lakh).
Sanction Cost: 111.80
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2
Maintenance cost due
₹9.29 lakh
The “5 Years Maintenance Cost Due” column shows 9.29 (₹ lakh).
5 Years Maintenance Cost Due: 9.29
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-10-2007
The completion date column reads “Financial: 06-11-2007/ Physical: 31-10-2007”; the physical completion date is 31-10-2007.
Completion Date: Financial: 06-11-2007/ Physical: 31-10-2007
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.500 km
Road length 7.500 km; 7.500 km recorded as completed.
Road Length (Kms): 7.500
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 2