Project record
T16-Pethandlahalli to Gudipally road
PMGSY-III · package KN19161 · Mulbagal block · Maintenance
- Location
- Mulbagal block, Kolar district
- Alignment drawn
- 5.8 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
T16-Pethandlahalli to Gudipally road
OMMAS lists PMGSY-III work KN19161 as “T16-Pethandlahalli to Gudipally road”.
Road Name / Bridge Name: T16-Pethandlahalli to Gudipally road
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Project / work ID
KN19161
OMMAS package number KN19161.
Package No.: KN19161
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Contractor
BMC Gowda Constructions
OMMAS lists the contractor for this work as “BMC Gowda Constructions”.
Contractor Name: BMC Gowda Constructions [22 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹354.74 lakh
The sanction cost is recorded as 354.74 (₹ lakh).
Sanction Cost: 354.74
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Maintenance cost due
₹24.58 lakh
The “5 Years Maintenance Cost Due” column shows 24.58 (₹ lakh).
5 Years Maintenance Cost Due: 24.58
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
07-08-2022
The completion date column reads “Financial: 31-08-2023/ Physical: 07-08-2022”; the physical completion date is 07-08-2022.
Completion Date: Financial: 31-08-2023/ Physical: 07-08-2022
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.803 km
Road length 5.803 km; 5.800 km recorded as completed.
Road Length (Kms): 5.803
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3