MRL01- Jonnapalli-Digavapalli mdr Road to Hodli mdr via Dimbala, Champalli,devalapalli
PMGSY-III · package KN19162 · Srinivasapura block · Maintenance
- Location
- Srinivasapura block, Kolar district
- Alignment drawn
- 6.2 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL01- Jonnapalli-Digavapalli mdr Road to Hodli mdr via Dimbala, Champalli,devalapalli
OMMAS lists PMGSY-III work KN19162 as “MRL01- Jonnapalli-Digavapalli mdr Road to Hodli mdr via Dimbala, Champalli,devalapalli”.
Road Name / Bridge Name: MRL01- Jonnapalli-Digavapalli mdr Road to Hodli mdr via Dimbala, Champalli,devalapalli
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Project / work ID
KN19162
OMMAS package number KN19162.
Package No.: KN19162
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Contractor
A S MANJUNATH
OMMAS lists the contractor for this work as “A S MANJUNATH”.
Contractor Name: A S MANJUNATH [13 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹683.55 lakh
The sanction cost is recorded as 683.55 (₹ lakh).
Sanction Cost: 683.55
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Maintenance cost due
₹54.33 lakh
The “5 Years Maintenance Cost Due” column shows 54.33 (₹ lakh).
5 Years Maintenance Cost Due: 54.33
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
12-06-2021
The completion date column reads “Financial: 04-12-2021/ Physical: 12-06-2021”; the physical completion date is 12-06-2021.
Completion Date: Financial: 04-12-2021/ Physical: 12-06-2021
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
11.480 km
Road length 11.480 km; 11.480 km recorded as completed.
Road Length (Kms): 11.480
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance