Project record
MRL06-GBK Road to Byraganapalli -Yadaganapalli Road via Pathagowanpalli,G Reddivaripalli, Agrahara Thoragonigadda
PMGSY-III · package KN19163 · Srinivasapura block · Maintenance
- Location
- Srinivasapura block, Kolar district
- Alignment drawn
- 2.2 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN19163 as “MRL06-GBK Road to Byraganapalli -Yadaganapalli Road via Pathagowanpalli,G Reddivaripalli, Agrahara Thoragonigadda”.
Road Name / Bridge Name: MRL06-GBK Road to Byraganapalli -Yadaganapalli Road via Pathagowanpalli,G Reddivaripalli, Agrahara Thoragonigadda
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Project / work ID
KN19163
OMMAS package number KN19163.
Package No.: KN19163
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Contractor
K V Sathyanararayana Reddy
OMMAS lists the contractor for this work as “K V Sathyanararayana Reddy”.
Contractor Name: K V Sathyanararayana Reddy [20 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹392.94 lakh
The sanction cost is recorded as 392.94 (₹ lakh).
Sanction Cost: 392.94
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Maintenance cost due
₹25.54 lakh
The “5 Years Maintenance Cost Due” column shows 25.54 (₹ lakh).
5 Years Maintenance Cost Due: 25.54
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
19-06-2021
The completion date column reads “Financial: 15-12-2021/ Physical: 19-06-2021”; the physical completion date is 19-06-2021.
Completion Date: Financial: 15-12-2021/ Physical: 19-06-2021
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.160 km
Road length 5.160 km; 5.160 km recorded as completed.
Road Length (Kms): 5.160
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3