Skip to content
CivicProof

Project record

MRL06-GBK Road to Byraganapalli -Yadaganapalli Road via Pathagowanpalli,G Reddivaripalli, Agrahara Thoragonigadda

PMGSY-III · package KN19163 · Srinivasapura block · Maintenance

Location
Srinivasapura block, Kolar district
Alignment drawn
2.2 km · official GIS
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

OMMAS lists PMGSY-III work KN19163 as “MRL06-GBK Road to Byraganapalli -Yadaganapalli Road via Pathagowanpalli,G Reddivaripalli, Agrahara Thoragonigadda”.

Road Name / Bridge Name: MRL06-GBK Road to Byraganapalli -Yadaganapalli Road via Pathagowanpalli,G Reddivaripalli, Agrahara Thoragonigadda

[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Project / work ID

KN19163

OMMAS package number KN19163.

VerifiedOfficial record

Responsible agency

DPIU Of Kolar

The programme implementation unit is recorded as “DPIU Of Kolar”.

Programme Implementation Unit: DPIU Of Kolar

[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Contractor

K V Sathyanararayana Reddy

OMMAS lists the contractor for this work as “K V Sathyanararayana Reddy”.

Contractor Name: K V Sathyanararayana Reddy [20 Jul 2020]

[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹392.94 lakh

The sanction cost is recorded as 392.94 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹25.54 lakh

The “5 Years Maintenance Cost Due” column shows 25.54 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

19-06-2021

The completion date column reads “Financial: 15-12-2021/ Physical: 19-06-2021”; the physical completion date is 19-06-2021.

Completion Date: Financial: 15-12-2021/ Physical: 19-06-2021

[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

5.160 km

Road length 5.160 km; 5.160 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record