Project record
T15-SP Road to LP Road via Kornahalli, Pataballapalli, Tantharlapalli, Chennapalli, Bachivaripalli, Ganganagaripalli
PMGSY-III · package KN19164 · Srinivasapura block · Maintenance
- Location
- Srinivasapura block, Kolar district
- Alignment drawn
- 3.7 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN19164 as “T15-SP Road to LP Road via Kornahalli, Pataballapalli, Tantharlapalli, Chennapalli, Bachivaripalli, Ganganagaripalli”.
Road Name / Bridge Name: T15-SP Road to LP Road via Kornahalli, Pataballapalli, Tantharlapalli, Chennapalli, Bachivaripalli, Ganganagaripalli
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Project / work ID
KN19164
OMMAS package number KN19164.
Package No.: KN19164
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Contractor
K V Sathyanararayana Reddy
OMMAS lists the contractor for this work as “K V Sathyanararayana Reddy”.
Contractor Name: K V Sathyanararayana Reddy [20 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹506.57 lakh
The sanction cost is recorded as 506.57 (₹ lakh).
Sanction Cost: 506.57
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Maintenance cost due
₹44.48 lakh
The “5 Years Maintenance Cost Due” column shows 44.48 (₹ lakh).
5 Years Maintenance Cost Due: 44.48
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
03-09-2021
The completion date column reads “Financial: 23-12-2021/ Physical: 03-09-2021”; the physical completion date is 03-09-2021.
Completion Date: Financial: 23-12-2021/ Physical: 03-09-2021
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.570 km
Road length 9.570 km; 9.570 km recorded as completed.
Road Length (Kms): 9.570
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-III (CSV export), p. 4