Project record
Imp. to road from Bangarpet Kanumanahalli - Kadirenahalli
PMGSY-I · package KN1918 · Bangarpet block · Maintenance
- Location
- Bangarpet block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Imp. to road from Bangarpet Kanumanahalli - Kadirenahalli
OMMAS lists PMGSY-I work KN1918 as “Imp. to road from Bangarpet Kanumanahalli - Kadirenahalli”.
Road Name / Bridge Name: Imp. to road from Bangarpet Kanumanahalli - Kadirenahalli
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3
Project / work ID
KN1918
OMMAS package number KN1918.
Package No.: KN1918
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3
Contractor
Karnataka Land Army Corporation
OMMAS lists the contractor for this work as “Karnataka Land Army Corporation”.
Contractor Name: Karnataka Land Army Corporation [14 Jun 2006]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹138.95 lakh
The sanction cost is recorded as 138.95 (₹ lakh).
Sanction Cost: 138.95
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3
Maintenance cost due
₹9.94 lakh
The “5 Years Maintenance Cost Due” column shows 9.94 (₹ lakh).
5 Years Maintenance Cost Due: 9.94
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2009
The completion date column reads “Financial: 19-11-2010/ Physical: 30-06-2009”; the physical completion date is 30-06-2009.
Completion Date: Financial: 19-11-2010/ Physical: 30-06-2009
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.000 km
Road length 8.000 km; 8.000 km recorded as completed.
Road Length (Kms): 8.000
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 3