Project record
B.B. road - Rachapura via Jambapura, Madanahalli, Shettivarahalli, Balagere
PMGSY-I · package KN1919 · Kolar block · Maintenance
- Location
- Kolar block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
B.B. road - Rachapura via Jambapura, Madanahalli, Shettivarahalli, Balagere
OMMAS lists PMGSY-I work KN1919 as “B.B. road - Rachapura via Jambapura, Madanahalli, Shettivarahalli, Balagere”.
Road Name / Bridge Name: B.B. road - Rachapura via Jambapura, Madanahalli, Shettivarahalli, Balagere
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8
Project / work ID
KN1919
OMMAS package number KN1919.
Package No.: KN1919
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8
Contractor
Karnataka Land Army Corporation
OMMAS lists the contractor for this work as “Karnataka Land Army Corporation”.
Contractor Name: Karnataka Land Army Corporation [14 Jun 2006]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹88.00 lakh
The sanction cost is recorded as 88.00 (₹ lakh).
Sanction Cost: 88.00
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8
Maintenance cost due
₹8.09 lakh
The “5 Years Maintenance Cost Due” column shows 8.09 (₹ lakh).
5 Years Maintenance Cost Due: 8.09
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2009
The completion date column reads “Financial: 19-11-2010/ Physical: 31-05-2009”; the physical completion date is 31-05-2009.
Completion Date: Financial: 19-11-2010/ Physical: 31-05-2009
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.510 km
Road length 6.510 km; 6.510 km recorded as completed.
Road Length (Kms): 6.510
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 8