Project record
Baragur - Kolar Taluk Border - Tamilnadu Border (KMH road T04)
PMGSY-I · package KN1919 · Malur block · Maintenance
- Location
- Malur block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Baragur - Kolar Taluk Border - Tamilnadu Border (KMH road T04)
OMMAS lists PMGSY-I work KN1919 as “Baragur - Kolar Taluk Border - Tamilnadu Border (KMH road T04)”.
Road Name / Bridge Name: Baragur - Kolar Taluk Border - Tamilnadu Border (KMH road T04)
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10
Project / work ID
KN1919
OMMAS package number KN1919.
Package No.: KN1919
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10
Contractor
Karnataka Land Army Corporation
OMMAS lists the contractor for this work as “Karnataka Land Army Corporation”.
Contractor Name: Karnataka Land Army Corporation [14 Jun 2006]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹120.25 lakh
The sanction cost is recorded as 120.25 (₹ lakh).
Sanction Cost: 120.25
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10
Maintenance cost due
₹9.94 lakh
The “5 Years Maintenance Cost Due” column shows 9.94 (₹ lakh).
5 Years Maintenance Cost Due: 9.94
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2009
The completion date column reads “Financial: 07-03-2011/ Physical: 31-05-2009”; the physical completion date is 31-05-2009.
Completion Date: Financial: 07-03-2011/ Physical: 31-05-2009
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.000 km
Road length 8.000 km; 8.000 km recorded as completed.
Road Length (Kms): 8.000
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 10