Project record

D N Doddi - Tamilnadu Border

PMGSY-I · package KN1945 · Malur block · Completed

Location
Malur block, Kolar district
Alignment drawn
none published: found by name
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

D N Doddi - Tamilnadu Border

OMMAS lists PMGSY-I work KN1945 as “D N Doddi - Tamilnadu Border”.

Road Name / Bridge Name: D N Doddi - Tamilnadu Border

[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11

VerifiedOfficial record

Project / work ID

KN1945

OMMAS package number KN1945.

VerifiedOfficial record

Responsible agency

DPIU Of Kolar

The programme implementation unit is recorded as “DPIU Of Kolar”.

Programme Implementation Unit: DPIU Of Kolar

[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11

VerifiedOfficial record

Contractor

S Chandraiaha

OMMAS lists the contractor for this work as “S Chandraiaha”.

Contractor Name: S Chandraiaha [30 May 2007]

[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹230.00 lakh

The sanction cost is recorded as 230.00 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹21.76 lakh

The “5 Years Maintenance Cost Due” column shows 21.76 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

30-06-2009

The completion date column reads “Financial: 28-07-2009/ Physical: 30-06-2009”; the physical completion date is 30-06-2009.

Completion Date: Financial: 28-07-2009/ Physical: 30-06-2009

[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

14.520 km

Road length 14.520 km; 14.520 km recorded as completed.

VerifiedOfficial record

Stage of work

Completed

OMMAS records the stage of progress as “Completed”.

VerifiedOfficial record