C.R.F. road to B.B. road via Valageranahalli, Bangawadi, Masthenahalli, Bagalahalli

PMGSY-I · package KN1947 · Srinivasapura block · Completed

Location
Srinivasapura block, Kolar district
Alignment drawn
none published: found by name
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

C.R.F. road to B.B. road via Valageranahalli, Bangawadi, Masthenahalli, Bagalahalli

OMMAS lists PMGSY-I work KN1947 as “C.R.F. road to B.B. road via Valageranahalli, Bangawadi, Masthenahalli, Bagalahalli”.

Road Name / Bridge Name: C.R.F. road to B.B. road via Valageranahalli, Bangawadi, Masthenahalli, Bagalahalli

[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16

VerifiedOfficial record

Project / work ID

KN1947

OMMAS package number KN1947.

VerifiedOfficial record

Responsible agency

DPIU Of Kolar

The programme implementation unit is recorded as “DPIU Of Kolar”.

Programme Implementation Unit: DPIU Of Kolar

[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16

VerifiedOfficial record

Contractor

V Krishna Reddy

OMMAS lists the contractor for this work as “V Krishna Reddy”.

Contractor Name: V Krishna Reddy [30 Apr 2007]

[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹174.00 lakh

The sanction cost is recorded as 174.00 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹12.63 lakh

The “5 Years Maintenance Cost Due” column shows 12.63 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

31-03-2009

The completion date column reads “Financial: 27-01-2010/ Physical: 31-03-2009”; the physical completion date is 31-03-2009.

Completion Date: Financial: 27-01-2010/ Physical: 31-03-2009

[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 16

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

8.430 km

Road length 8.430 km; 8.430 km recorded as completed.

VerifiedOfficial record

Stage of work

Completed

OMMAS records the stage of progress as “Completed”.

VerifiedOfficial record