Project record
Avani - T10
PMGSY-I · package KN1981 · Mulbagal block · Completed
- Location
- Mulbagal block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Avani - T10
OMMAS lists PMGSY-I work KN1981 as “Avani - T10”.
Road Name / Bridge Name: Avani - T10
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Project / work ID
KN1981
OMMAS package number KN1981.
Package No.: KN1981
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Contractor
B M Chandre Gowda
OMMAS lists the contractor for this work as “B M Chandre Gowda”.
Contractor Name: B M Chandre Gowda [11 Dec 2008]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹110.69 lakh
The sanction cost is recorded as 110.69 (₹ lakh).
Sanction Cost: 110.69
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Maintenance cost due
₹7.65 lakh
The “5 Years Maintenance Cost Due” column shows 7.65 (₹ lakh).
5 Years Maintenance Cost Due: 7.65
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2009
The completion date column reads “Financial: 11-03-2010/ Physical: 30-09-2009”; the physical completion date is 30-09-2009.
Completion Date: Financial: 11-03-2010/ Physical: 30-09-2009
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.980 km
Road length 3.980 km; 3.980 km recorded as completed.
Road Length (Kms): 3.980
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 14