Project record
Kaveri Nagara - Bangarpet-Bethamngala road
PMGSY-I · package KN1983 · Bangarpet block · Completed
- Location
- Bangarpet block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kaveri Nagara - Bangarpet-Bethamngala road
OMMAS lists PMGSY-I work KN1983 as “Kaveri Nagara - Bangarpet-Bethamngala road”.
Road Name / Bridge Name: Kaveri Nagara - Bangarpet-Bethamngala road
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4
Project / work ID
KN1983
OMMAS package number KN1983.
Package No.: KN1983
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4
Contractor
M NAGARAJA
OMMAS lists the contractor for this work as “M NAGARAJA”.
Contractor Name: M NAGARAJA [21 Feb 2009]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹53.80 lakh
The sanction cost is recorded as 53.80 (₹ lakh).
Sanction Cost: 53.80
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4
Maintenance cost due
₹4.23 lakh
The “5 Years Maintenance Cost Due” column shows 4.23 (₹ lakh).
5 Years Maintenance Cost Due: 4.23
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2010
The completion date column reads “Financial: 25-10-2010/ Physical: 31-03-2010”; the physical completion date is 31-03-2010.
Completion Date: Financial: 25-10-2010/ Physical: 31-03-2010
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.200 km
Road length 2.200 km; 2.200 km recorded as completed.
Road Length (Kms): 2.200
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 4