Project record
Tongalakoppa - T02
PMGSY-I · package KN1987 · Bangarpet block · Completed
- Location
- Bangarpet block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Tongalakoppa - T02
OMMAS lists PMGSY-I work KN1987 as “Tongalakoppa - T02”.
Road Name / Bridge Name: Tongalakoppa - T02
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5
Project / work ID
KN1987
OMMAS package number KN1987.
Package No.: KN1987
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5
Contractor
N R LAKSHMINARAYANA
OMMAS lists the contractor for this work as “N R LAKSHMINARAYANA”.
Contractor Name: N R LAKSHMINARAYANA [10 Dec 2008]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹87.15 lakh
The sanction cost is recorded as 87.15 (₹ lakh).
Sanction Cost: 87.15
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5
Maintenance cost due
₹6.23 lakh
The “5 Years Maintenance Cost Due” column shows 6.23 (₹ lakh).
5 Years Maintenance Cost Due: 6.23
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2009
The completion date column reads “Financial: 26-11-2009/ Physical: 31-07-2009”; the physical completion date is 31-07-2009.
Completion Date: Financial: 26-11-2009/ Physical: 31-07-2009
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.240 km
Road length 3.240 km; 3.240 km recorded as completed.
Road Length (Kms): 3.240
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 5