Project record
Agalakote - Kolar-Tekal road
PMGSY-I · package KN1990 · Malur block · Completed
- Location
- Malur block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Agalakote - Kolar-Tekal road
OMMAS lists PMGSY-I work KN1990 as “Agalakote - Kolar-Tekal road”.
Road Name / Bridge Name: Agalakote - Kolar-Tekal road
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11
Project / work ID
KN1990
OMMAS package number KN1990.
Package No.: KN1990
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11
Contractor
N Srinatha Reddy
OMMAS lists the contractor for this work as “N Srinatha Reddy”.
Contractor Name: N Srinatha Reddy [02 Mar 2009]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹213.50 lakh
The sanction cost is recorded as 213.50 (₹ lakh).
Sanction Cost: 213.50
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11
Maintenance cost due
₹14.72 lakh
The “5 Years Maintenance Cost Due” column shows 14.72 (₹ lakh).
5 Years Maintenance Cost Due: 14.72
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-11-2009
The completion date column reads “Financial: 11-03-2010/ Physical: 30-11-2009”; the physical completion date is 30-11-2009.
Completion Date: Financial: 11-03-2010/ Physical: 30-11-2009
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.660 km
Road length 7.660 km; 7.660 km recorded as completed.
Road Length (Kms): 7.660
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 11