Project record
Jannagatha - L085
PMGSY-I · package KN1992 · Kolar block · Completed
- Location
- Kolar block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Jannagatha - L085
OMMAS lists PMGSY-I work KN1992 as “Jannagatha - L085”.
Road Name / Bridge Name: Jannagatha - L085
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9
Project / work ID
KN1992
OMMAS package number KN1992.
Package No.: KN1992
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9
Contractor
K S SRINIVAS
OMMAS lists the contractor for this work as “K S SRINIVAS”.
Contractor Name: K S SRINIVAS [11 Dec 2008]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹63.43 lakh
The sanction cost is recorded as 63.43 (₹ lakh).
Sanction Cost: 63.43
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9
Maintenance cost due
₹4.84 lakh
The “5 Years Maintenance Cost Due” column shows 4.84 (₹ lakh).
5 Years Maintenance Cost Due: 4.84
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
28-02-2010
The completion date column reads “Financial: 16-04-2010/ Physical: 28-02-2010”; the physical completion date is 28-02-2010.
Completion Date: Financial: 16-04-2010/ Physical: 28-02-2010
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.520 km
Road length 2.520 km; 2.520 km recorded as completed.
Road Length (Kms): 2.520
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 9