Project record
Kondenahalli - T-08
PMGSY-I · package KN1997 · Bangarpet block · Completed
- Location
- Bangarpet block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kondenahalli - T-08
OMMAS lists PMGSY-I work KN1997 as “Kondenahalli - T-08”.
Road Name / Bridge Name: Kondenahalli - T-08
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Project / work ID
KN1997
OMMAS package number KN1997.
Package No.: KN1997
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Contractor
B.H.RAMAKRISHNAPPA GOWDA
OMMAS lists the contractor for this work as “B.H.RAMAKRISHNAPPA GOWDA”.
Contractor Name: B.H.RAMAKRISHNAPPA GOWDA [14 Aug 2009]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹167.33 lakh
The sanction cost is recorded as 167.33 (₹ lakh).
Sanction Cost: 167.33
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Maintenance cost due
₹11.57 lakh
The “5 Years Maintenance Cost Due” column shows 11.57 (₹ lakh).
5 Years Maintenance Cost Due: 11.57
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-08-2010
The completion date column reads “Financial: 25-10-2010/ Physical: 31-08-2010”; the physical completion date is 31-08-2010.
Completion Date: Financial: 25-10-2010/ Physical: 31-08-2010
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.670 km
Road length 5.670 km; 5.670 km recorded as completed.
Road Length (Kms): 5.670
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6