Project record
Sampangipura - T-08
PMGSY-I · package KN1998 · Bangarpet block · Completed
- Location
- Bangarpet block, Kolar district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Sampangipura - T-08
OMMAS lists PMGSY-I work KN1998 as “Sampangipura - T-08”.
Road Name / Bridge Name: Sampangipura - T-08
[1]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Project / work ID
KN1998
OMMAS package number KN1998.
Package No.: KN1998
[2]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Responsible agency
DPIU Of Kolar
The programme implementation unit is recorded as “DPIU Of Kolar”.
Programme Implementation Unit: DPIU Of Kolar
[3]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Contractor
V NARAYANASWAMY
OMMAS lists the contractor for this work as “V NARAYANASWAMY”.
Contractor Name: V NARAYANASWAMY [09 Sep 2009]
[4]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹159.40 lakh
The sanction cost is recorded as 159.40 (₹ lakh).
Sanction Cost: 159.40
[5]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Maintenance cost due
₹11.08 lakh
The “5 Years Maintenance Cost Due” column shows 11.08 (₹ lakh).
5 Years Maintenance Cost Due: 11.08
[9]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2011
The completion date column reads “Financial: 16-01-2012/ Physical: 30-09-2011”; the physical completion date is 30-09-2011.
Completion Date: Financial: 16-01-2012/ Physical: 30-09-2011
[10]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.430 km
Road length 5.430 km; 5.430 km recorded as completed.
Road Length (Kms): 5.430
[7]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Kolar, PMGSY-I (CSV export), p. 6