Project record
Ajjanahalli - Gollarahatti
PMGSY-I · package KN0202 · Magadi block · Completed
- Location
- Magadi block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Ajjanahalli - Gollarahatti
OMMAS lists PMGSY-I work KN0202 as “Ajjanahalli - Gollarahatti”.
Road Name / Bridge Name: Ajjanahalli - Gollarahatti
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 9
Project / work ID
KN0202
OMMAS package number KN0202.
Package No.: KN0202
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 9
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 9
Contractor
S K Putta Swamy
OMMAS lists the contractor for this work as “S K Putta Swamy”.
Contractor Name: S K Putta Swamy [27 Aug 2001]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹30.36 lakh
The sanction cost is recorded as 30.36 (₹ lakh).
Sanction Cost: 30.36
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-10-2002
The completion date column reads “Financial: 29-04-2006/ Physical: 31-10-2002”; the physical completion date is 31-10-2002.
Completion Date: Financial: 29-04-2006/ Physical: 31-10-2002
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.800 km
Road length 3.800 km; 3.800 km recorded as completed.
Road Length (Kms): 3.800
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 9
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 9