Project record
Hosadoddi to Kadanakuppe
PMGSY-I · package KN0207 · Ramanagar block · Completed
- Location
- Ramanagar block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Hosadoddi to Kadanakuppe
OMMAS lists PMGSY-I work KN0207 as “Hosadoddi to Kadanakuppe”.
Road Name / Bridge Name: Hosadoddi to Kadanakuppe
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 12
Project / work ID
KN0207
OMMAS package number KN0207.
Package No.: KN0207
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 12
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 12
Contractor
B K Prakash
OMMAS lists the contractor for this work as “B K Prakash”.
Contractor Name: B K Prakash [16 Oct 2002]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 12
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹6.54 lakh
The sanction cost is recorded as 6.54 (₹ lakh).
Sanction Cost: 6.54
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 12
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-08-2004
The completion date column reads “Financial: 01-04-2005/ Physical: 31-08-2004”; the physical completion date is 31-08-2004.
Completion Date: Financial: 01-04-2005/ Physical: 31-08-2004
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 12
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
0.750 km
Road length 0.750 km; 0.750 km recorded as completed.
Road Length (Kms): 0.750
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 12
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 12