Project record
Agrahara Bayalu - L-058
PMGSY-I · package KN02107 · Kanakpur block · Completed
- Location
- Kanakpur block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Agrahara Bayalu - L-058
OMMAS lists PMGSY-I work KN02107 as “Agrahara Bayalu - L-058”.
Road Name / Bridge Name: Agrahara Bayalu - L-058
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8
Project / work ID
KN02107
OMMAS package number KN02107.
Package No.: KN02107
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8
Contractor
Ramesh H.S
OMMAS lists the contractor for this work as “Ramesh H.S”.
Contractor Name: Ramesh H.S [29 Oct 2009]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹145.56 lakh
The sanction cost is recorded as 145.56 (₹ lakh).
Sanction Cost: 145.56
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8
Maintenance cost due
₹13.38 lakh
The “5 Years Maintenance Cost Due” column shows 13.38 (₹ lakh).
5 Years Maintenance Cost Due: 13.38
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2011
The completion date column reads “Financial: 18-11-2011/ Physical: 30-06-2011”; the physical completion date is 30-06-2011.
Completion Date: Financial: 18-11-2011/ Physical: 30-06-2011
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.360 km
Road length 6.360 km; 6.360 km recorded as completed.
Road Length (Kms): 6.360
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 8