Project record
Hukunda - Shivanegoudanadoddi
PMGSY-I · package KN0219A · Kanakpur block · Completed
- Location
- Kanakpur block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Hukunda - Shivanegoudanadoddi
OMMAS lists PMGSY-I work KN0219A as “Hukunda - Shivanegoudanadoddi”.
Road Name / Bridge Name: Hukunda - Shivanegoudanadoddi
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6
Project / work ID
KN0219A
OMMAS package number KN0219A.
Package No.: KN0219A
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6
Contractor
Sri Lakshman
OMMAS lists the contractor for this work as “Sri Lakshman”.
Contractor Name: Sri Lakshman [08 Dec 2006]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹128.78 lakh
The sanction cost is recorded as 128.78 (₹ lakh).
Sanction Cost: 128.78
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6
Maintenance cost due
₹9.78 lakh
The “5 Years Maintenance Cost Due” column shows 9.78 (₹ lakh).
5 Years Maintenance Cost Due: 9.78
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2008
The completion date column reads “Financial: 09-09-2009/ Physical: 31-07-2008”; the physical completion date is 31-07-2008.
Completion Date: Financial: 09-09-2009/ Physical: 31-07-2008
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
10.000 km
Road length 10.000 km; 10.000 km recorded as completed.
Road Length (Kms): 10.000
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 6