Project record
Soligere - Honniganahalli
PMGSY-I · package KN0250 · Kanakpur block · Completed
- Location
- Kanakpur block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Soligere - Honniganahalli
OMMAS lists PMGSY-I work KN0250 as “Soligere - Honniganahalli”.
Road Name / Bridge Name: Soligere - Honniganahalli
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Project / work ID
KN0250
OMMAS package number KN0250.
Package No.: KN0250
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Contractor
G.Mallikarjuna
OMMAS lists the contractor for this work as “G.Mallikarjuna”.
Contractor Name: G.Mallikarjuna [07 Jun 2008]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹93.11 lakh
The sanction cost is recorded as 93.11 (₹ lakh).
Sanction Cost: 93.11
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Maintenance cost due
₹7.55 lakh
The “5 Years Maintenance Cost Due” column shows 7.55 (₹ lakh).
5 Years Maintenance Cost Due: 7.55
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-10-2009
The completion date column reads “Financial: 31-01-2011/ Physical: 31-10-2009”; the physical completion date is 31-10-2009.
Completion Date: Financial: 31-01-2011/ Physical: 31-10-2009
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.020 km
Road length 4.020 km; 4.020 km recorded as completed.
Road Length (Kms): 4.020
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7