Project record
Gullahatti Kaval - NH-209
PMGSY-I · package KN0267 · Kanakpur block · Completed
- Location
- Kanakpur block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Gullahatti Kaval - NH-209
OMMAS lists PMGSY-I work KN0267 as “Gullahatti Kaval - NH-209”.
Road Name / Bridge Name: Gullahatti Kaval - NH-209
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Project / work ID
KN0267
OMMAS package number KN0267.
Package No.: KN0267
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Contractor
SRINIVAS H AMMAPUR
OMMAS lists the contractor for this work as “SRINIVAS H AMMAPUR”.
Contractor Name: SRINIVAS H AMMAPUR [31 Jan 2009]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹187.75 lakh
The sanction cost is recorded as 187.75 (₹ lakh).
Sanction Cost: 187.75
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Maintenance cost due
₹15.26 lakh
The “5 Years Maintenance Cost Due” column shows 15.26 (₹ lakh).
5 Years Maintenance Cost Due: 15.26
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2010
The completion date column reads “Financial: 22-10-2011/ Physical: 31-05-2010”; the physical completion date is 31-05-2010.
Completion Date: Financial: 22-10-2011/ Physical: 31-05-2010
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.690 km
Road length 7.690 km; 7.690 km recorded as completed.
Road Length (Kms): 7.690
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 7