Project record
Shambulingegowadanadoddi - T01
PMGSY-I · package KN0276 · Channapatna block · Completed
- Location
- Channapatna block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Shambulingegowadanadoddi - T01
OMMAS lists PMGSY-I work KN0276 as “Shambulingegowadanadoddi - T01”.
Road Name / Bridge Name: Shambulingegowadanadoddi - T01
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Project / work ID
KN0276
OMMAS package number KN0276.
Package No.: KN0276
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Contractor
B.Virupaksha Gowda
OMMAS lists the contractor for this work as “B.Virupaksha Gowda”.
Contractor Name: B.Virupaksha Gowda [15 May 2009]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹121.77 lakh
The sanction cost is recorded as 121.77 (₹ lakh).
Sanction Cost: 121.77
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Maintenance cost due
₹10.70 lakh
The “5 Years Maintenance Cost Due” column shows 10.70 (₹ lakh).
5 Years Maintenance Cost Due: 10.70
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
28-02-2010
The completion date column reads “Financial: 13-04-2011/ Physical: 28-02-2010”; the physical completion date is 28-02-2010.
Completion Date: Financial: 13-04-2011/ Physical: 28-02-2010
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.390 km
Road length 5.390 km; 5.390 km recorded as completed.
Road Length (Kms): 5.390
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3