Project record
Kanva T.B - T01
PMGSY-I · package KN0278 · Channapatna block · Completed
- Location
- Channapatna block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kanva T.B - T01
OMMAS lists PMGSY-I work KN0278 as “Kanva T.B - T01”.
Road Name / Bridge Name: Kanva T.B - T01
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Project / work ID
KN0278
OMMAS package number KN0278.
Package No.: KN0278
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Contractor
M C Mahesh
OMMAS lists the contractor for this work as “M C Mahesh”.
Contractor Name: M C Mahesh [29 Dec 2008]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹160.42 lakh
The sanction cost is recorded as 160.42 (₹ lakh).
Sanction Cost: 160.42
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Maintenance cost due
₹13.24 lakh
The “5 Years Maintenance Cost Due” column shows 13.24 (₹ lakh).
5 Years Maintenance Cost Due: 13.24
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2011
The completion date column reads “Financial: 29-09-2011/ Physical: 30-04-2011”; the physical completion date is 30-04-2011.
Completion Date: Financial: 29-09-2011/ Physical: 30-04-2011
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.670 km
Road length 6.670 km; 6.670 km recorded as completed.
Road Length (Kms): 6.670
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-I (CSV export), p. 3