Project record
MRL1-Vandaraguppe SH to Patlu via Gollaradoddi, Devarahosahalli, Komanalli
PMGSY-II · package KN28120 · Channapatna block · Maintenance
- Location
- Channapatna block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL1-Vandaraguppe SH to Patlu via Gollaradoddi, Devarahosahalli, Komanalli
OMMAS lists PMGSY-II work KN28120 as “MRL1-Vandaraguppe SH to Patlu via Gollaradoddi, Devarahosahalli, Komanalli”.
Road Name / Bridge Name: MRL1-Vandaraguppe SH to Patlu via Gollaradoddi, Devarahosahalli, Komanalli
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1
Project / work ID
KN28120
OMMAS package number KN28120.
Package No.: KN28120
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1
Contractor
G .H .NAGARAJU
OMMAS lists the contractor for this work as “G .H .NAGARAJU”.
Contractor Name: G .H .NAGARAJU [04 Mar 2014]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹167.62 lakh
The sanction cost is recorded as 167.62 (₹ lakh).
Sanction Cost: 167.62
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1
Maintenance cost due
₹15.82 lakh
The “5 Years Maintenance Cost Due” column shows 15.82 (₹ lakh).
5 Years Maintenance Cost Due: 15.82
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-05-2015
The completion date column reads “Financial: 02-01-2017/ Physical: 30-05-2015”; the physical completion date is 30-05-2015.
Completion Date: Financial: 02-01-2017/ Physical: 30-05-2015
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.410 km
Road length 5.410 km; 5.410 km recorded as completed.
Road Length (Kms): 5.410
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1