MRL4-Aremegaladoddi to MDR Mullahalli via Gollahalli

PMGSY-II · package KN28122 · Kanakpur block · Maintenance

Location
Kanakpur block, Ramanagara (Bengaluru South) district
Alignment drawn
none published: found by name
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

MRL4-Aremegaladoddi to MDR Mullahalli via Gollahalli

OMMAS lists PMGSY-II work KN28122 as “MRL4-Aremegaladoddi to MDR Mullahalli via Gollahalli”.

Road Name / Bridge Name: MRL4-Aremegaladoddi to MDR Mullahalli via Gollahalli

[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Project / work ID

KN28122

OMMAS package number KN28122.

VerifiedOfficial record

Responsible agency

DPIU Of Ramanagaram

The programme implementation unit is recorded as “DPIU Of Ramanagaram”.

Programme Implementation Unit: DPIU Of Ramanagaram

[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Contractor

Y V R CONSTRUCTIONS

OMMAS lists the contractor for this work as “Y V R CONSTRUCTIONS”.

Contractor Name: Y V R CONSTRUCTIONS [03 Mar 2014]

[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹178.38 lakh

The sanction cost is recorded as 178.38 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹18.94 lakh

The “5 Years Maintenance Cost Due” column shows 18.94 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

30-04-2016

The completion date column reads “Financial: 08-02-2017/ Physical: 30-04-2016”; the physical completion date is 30-04-2016.

Completion Date: Financial: 08-02-2017/ Physical: 30-04-2016

[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

6.480 km

Road length 6.480 km; 6.050 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record