Project record
MRL4-Thorepalya- Kodipalya-Kalya Road
PMGSY-II · package KN28127 · Magadi block · Maintenance
- Location
- Magadi block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL4-Thorepalya- Kodipalya-Kalya Road
OMMAS lists PMGSY-II work KN28127 as “MRL4-Thorepalya- Kodipalya-Kalya Road”.
Road Name / Bridge Name: MRL4-Thorepalya- Kodipalya-Kalya Road
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Project / work ID
KN28127
OMMAS package number KN28127.
Package No.: KN28127
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Contractor
M.G.Hanumantharaju [28 Feb 2014], M.G.Hanumantharaju
OMMAS lists the contractor for this work as “M.G.Hanumantharaju [28 Feb 2014], M.G.Hanumantharaju”.
Contractor Name: M.G.Hanumantharaju [28 Feb 2014], M.G.Hanumantharaju [26 Mar 2015]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹221.93 lakh
The sanction cost is recorded as 221.93 (₹ lakh).
Sanction Cost: 221.93
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Maintenance cost due
₹16.99 lakh
The “5 Years Maintenance Cost Due” column shows 16.99 (₹ lakh).
5 Years Maintenance Cost Due: 16.99
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2016
The completion date column reads “Financial: 19-01-2017/ Physical: 30-04-2016”; the physical completion date is 30-04-2016.
Completion Date: Financial: 19-01-2017/ Physical: 30-04-2016
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.810 km
Road length 5.810 km; 5.810 km recorded as completed.
Road Length (Kms): 5.810
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2