Project record
MRL3-Ivagilu To Mayaganahalli Via Kenjigaranahalli,Ketohalli
PMGSY-II · package KN28128 · Ramanagar block · Maintenance
- Location
- Ramanagar block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL3-Ivagilu To Mayaganahalli Via Kenjigaranahalli,Ketohalli
OMMAS lists PMGSY-II work KN28128 as “MRL3-Ivagilu To Mayaganahalli Via Kenjigaranahalli,Ketohalli”.
Road Name / Bridge Name: MRL3-Ivagilu To Mayaganahalli Via Kenjigaranahalli,Ketohalli
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Project / work ID
KN28128
OMMAS package number KN28128.
Package No.: KN28128
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Contractor
C NARAYANA
OMMAS lists the contractor for this work as “C NARAYANA”.
Contractor Name: C NARAYANA [28 Feb 2014]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹195.95 lakh
The sanction cost is recorded as 195.95 (₹ lakh).
Sanction Cost: 195.95
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Maintenance cost due
₹15.01 lakh
The “5 Years Maintenance Cost Due” column shows 15.01 (₹ lakh).
5 Years Maintenance Cost Due: 15.01
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2016
The completion date column reads “Financial: 28-03-2017/ Physical: 30-04-2016”; the physical completion date is 30-04-2016.
Completion Date: Financial: 28-03-2017/ Physical: 30-04-2016
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.130 km
Road length 5.130 km; 5.438 km recorded as completed.
Road Length (Kms): 5.130
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-II (CSV export), p. 2