Project record
MRL45-Thokanayakanahalli to Kadledoddi via Basavalingappanadoddi
PMGSY-III · package KN28131 · Kanakpur block · Maintenance
- Location
- Kanakpur block, Ramanagara (Bengaluru South) district
- Alignment drawn
- 3.1 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL45-Thokanayakanahalli to Kadledoddi via Basavalingappanadoddi
OMMAS lists PMGSY-III work KN28131 as “MRL45-Thokanayakanahalli to Kadledoddi via Basavalingappanadoddi”.
Road Name / Bridge Name: MRL45-Thokanayakanahalli to Kadledoddi via Basavalingappanadoddi
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Project / work ID
KN28131
OMMAS package number KN28131.
Package No.: KN28131
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Contractor
M/s. KPJ CONSTRUCTION PVT LTD
OMMAS lists the contractor for this work as “M/s. KPJ CONSTRUCTION PVT LTD”.
Contractor Name: M/s. KPJ CONSTRUCTION PVT LTD [28 Jul 2021]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹214.78 lakh
The sanction cost is recorded as 214.78 (₹ lakh).
Sanction Cost: 214.78
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹20.50 lakh
The “5 Years Maintenance Cost Due” column shows 20.50 (₹ lakh).
5 Years Maintenance Cost Due: 20.50
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
25-09-2023
The completion date column reads “Financial: 30-08-2024/ Physical: 25-09-2023”; the physical completion date is 25-09-2023.
Completion Date: Financial: 30-08-2024/ Physical: 25-09-2023
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.790 km
Road length 3.790 km; 4.169 km recorded as completed.
Road Length (Kms): 3.790
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1