Project record
MRL08-Hanumanahalli to Thenganaikanahalli via Gerahalli
PMGSY-III · package KN28133 · Kanakpur block · Maintenance
- Location
- Kanakpur block, Ramanagara (Bengaluru South) district
- Alignment drawn
- 1.2 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL08-Hanumanahalli to Thenganaikanahalli via Gerahalli
OMMAS lists PMGSY-III work KN28133 as “MRL08-Hanumanahalli to Thenganaikanahalli via Gerahalli”.
Road Name / Bridge Name: MRL08-Hanumanahalli to Thenganaikanahalli via Gerahalli
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Project / work ID
KN28133
OMMAS package number KN28133.
Package No.: KN28133
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Contractor
Prakash Reddy V
OMMAS lists the contractor for this work as “Prakash Reddy V”.
Contractor Name: Prakash Reddy V [12 Jul 2021]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹473.68 lakh
The sanction cost is recorded as 473.68 (₹ lakh).
Sanction Cost: 473.68
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹46.41 lakh
The “5 Years Maintenance Cost Due” column shows 46.41 (₹ lakh).
5 Years Maintenance Cost Due: 46.41
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
05-01-2026
The completion date column reads “Financial: 24-08-2026/ Physical: 05-01-2026”; the physical completion date is 05-01-2026.
Completion Date: Financial: 24-08-2026/ Physical: 05-01-2026
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.245 km
Road length 8.245 km; 7.686 km recorded as completed.
Road Length (Kms): 8.245
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2