Project record

MRL41-BIDADI HAROHALLI MDR TO BYCHOHALLI

PMGSY-III · package KN28142 · Ramanagar block · Maintenance

Location
Ramanagar block, Ramanagara (Bengaluru South) district
Alignment drawn
548 m · official GIS
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

MRL41-BIDADI HAROHALLI MDR TO BYCHOHALLI

OMMAS lists PMGSY-III work KN28142 as “MRL41-BIDADI HAROHALLI MDR TO BYCHOHALLI”.

Road Name / Bridge Name: MRL41-BIDADI HAROHALLI MDR TO BYCHOHALLI

[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 4

VerifiedOfficial record

Project / work ID

KN28142

OMMAS package number KN28142.

VerifiedOfficial record

Responsible agency

DPIU Of Ramanagaram

The programme implementation unit is recorded as “DPIU Of Ramanagaram”.

Programme Implementation Unit: DPIU Of Ramanagaram

[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 4

VerifiedOfficial record

Contractor

M/s. KPJ CONSTRUCTION PVT LTD

OMMAS lists the contractor for this work as “M/s. KPJ CONSTRUCTION PVT LTD”.

Contractor Name: M/s. KPJ CONSTRUCTION PVT LTD [28 Jul 2021]

[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 4

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹274.19 lakh

The sanction cost is recorded as 274.19 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹29.87 lakh

The “5 Years Maintenance Cost Due” column shows 29.87 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

30-12-2023

The completion date column reads “Financial: 16-12-2024/ Physical: 30-12-2023”; the physical completion date is 30-12-2023.

Completion Date: Financial: 16-12-2024/ Physical: 30-12-2023

[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 4

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

5.675 km

Road length 5.675 km; 5.500 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record