Project record
MRL25-Kumbarapalya to Chikkahalli via Ganganahalli Basavanapalya
PMGSY-III · package KN28145 · Magadi block · Maintenance
- Location
- Magadi block, Ramanagara (Bengaluru South) district
- Alignment drawn
- 149 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL25-Kumbarapalya to Chikkahalli via Ganganahalli Basavanapalya
OMMAS lists PMGSY-III work KN28145 as “MRL25-Kumbarapalya to Chikkahalli via Ganganahalli Basavanapalya”.
Road Name / Bridge Name: MRL25-Kumbarapalya to Chikkahalli via Ganganahalli Basavanapalya
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Project / work ID
KN28145
OMMAS package number KN28145.
Package No.: KN28145
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Contractor
M/s. KPJ CONSTRUCTION PVT LTD
OMMAS lists the contractor for this work as “M/s. KPJ CONSTRUCTION PVT LTD”.
Contractor Name: M/s. KPJ CONSTRUCTION PVT LTD [28 Jul 2021]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹182.31 lakh
The sanction cost is recorded as 182.31 (₹ lakh).
Sanction Cost: 182.31
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹15.92 lakh
The “5 Years Maintenance Cost Due” column shows 15.92 (₹ lakh).
5 Years Maintenance Cost Due: 15.92
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
01-08-2024
The completion date column reads “Financial: 19-02-2025/ Physical: 01-08-2024”; the physical completion date is 01-08-2024.
Completion Date: Financial: 19-02-2025/ Physical: 01-08-2024
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.030 km
Road length 3.030 km; 2.985 km recorded as completed.
Road Length (Kms): 3.030
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 2