Project record
MRL15-Bagepalli Halagur SH to NH-275 via Lalagatta
PMGSY-III · package KN28153 · Channapatna block · Maintenance
- Location
- Channapatna block, Ramanagara (Bengaluru South) district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL15-Bagepalli Halagur SH to NH-275 via Lalagatta
OMMAS lists PMGSY-III work KN28153 as “MRL15-Bagepalli Halagur SH to NH-275 via Lalagatta”.
Road Name / Bridge Name: MRL15-Bagepalli Halagur SH to NH-275 via Lalagatta
[1]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Project / work ID
KN28153
OMMAS package number KN28153.
Package No.: KN28153
[2]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Ramanagaram
The programme implementation unit is recorded as “DPIU Of Ramanagaram”.
Programme Implementation Unit: DPIU Of Ramanagaram
[3]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Contractor
M C Mahesh
OMMAS lists the contractor for this work as “M C Mahesh”.
Contractor Name: M C Mahesh [24 Mar 2023]
[4]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹290.25 lakh
The sanction cost is recorded as 290.25 (₹ lakh).
Sanction Cost: 290.25
[5]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Maintenance cost due
₹24.85 lakh
The “5 Years Maintenance Cost Due” column shows 24.85 (₹ lakh).
5 Years Maintenance Cost Due: 24.85
[9]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-12-2024
The completion date column reads “Financial: 28-03-2026/ Physical: 30-12-2024”; the physical completion date is 30-12-2024.
Completion Date: Financial: 28-03-2026/ Physical: 30-12-2024
[10]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.190 km
Road length 4.190 km; 4.190 km recorded as completed.
Road Length (Kms): 4.190
[7]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Ramanagara, PMGSY-III (CSV export), p. 1