Project record
Impts. To road fromC.P.road to G.Y.Road Ch. 0-4.00km
PMGSY-I · package KN2501 · Pavagada block · Completed
- Location
- Pavagada block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Impts. To road fromC.P.road to G.Y.Road Ch. 0-4.00km
OMMAS lists PMGSY-I work KN2501 as “Impts. To road fromC.P.road to G.Y.Road Ch. 0-4.00km”.
Road Name / Bridge Name: Impts. To road fromC.P.road to G.Y.Road Ch. 0-4.00km
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 15
Project / work ID
KN2501
OMMAS package number KN2501.
Package No.: KN2501
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 15
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 15
Contractor
Karnataka Land Army Corporation
OMMAS lists the contractor for this work as “Karnataka Land Army Corporation”.
Contractor Name: Karnataka Land Army Corporation [26 Nov 2001]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 15
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹30.32 lakh
The sanction cost is recorded as 30.32 (₹ lakh).
Sanction Cost: 30.32
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 15
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2003
The completion date column reads “Financial: 01-04-2005/ Physical: 31-03-2003”; the physical completion date is 31-03-2003.
Completion Date: Financial: 01-04-2005/ Physical: 31-03-2003
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 15
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.130 km
Road length 4.130 km; 4.130 km recorded as completed.
Road Length (Kms): 4.130
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 15
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 15